Sirio Outfitting has dedicated its first years of activity to the world of cruise ships and has successfully completed works in navigation as well as the supply of various furnishing elements such as glass (also decorated and class B or C), antimicrobial headboards, solutions innovative to optimize costs and spaces for the various cruises (please visit some examples of our special products).
We have also successfully completed the following projects in Dry Dock
Silver Whisper
November 2018 Freeport Bahamas
Scope of work
- Replacement of the glasses on entrance doors
Work report
Activity completed in advance as scheduled on scope of work
CASINO AND SHOPS
DK5
Scope of work
- Replacement of n. 5 B15 Doors
- Supply and installation of awning external area
Work report
Activity completed as scheduled on scope of work
LA TERRAZZA RESTAURANT
DK7




Disney Wonder
September 2019 Vancouver CAN
Scope of work
- Replacement of the perforated metal ceiling with new ceiling retaining the existing format and painting with new color
- Restoration and painting of plaster frames with new color
- Restoration and painting of plaster ceiling with new color
Work report
Activity completed in advance as scheduled on scope of work
BUENA VISTA THEATER
DK5 FR. 91-117
Scope of work
- Replacing the wall covering on the wall of the area
- Restoration and painting of plaster frames with new color
- Restoration and painting of plaster ceiling with new color
- Removal of the existing metal ceiling on starboard and installation of a new decorative ceiling with new pattern and finishing
- Removal of the existing metal ceiling cassettes on port side and realization of a new ceiling based on the new layout of the area formed by a steel structure coated with painted panels, mouldings and metal decorations with the new color
- Replacement of the chandelier with ceiling restoration
- Removal of the partition wall of the kid’s area
- Restoration and painting of the skirting
Work reportActivity completed in advance as scheduled on scope of work
CONCIERGE LOUNGE
DK10 FR. 199-227
Scope of work
- Replacing the vanity with new accessories and finishing
- Modification of the wall niche with a new decorative panel and mouldings
- Installation of new lights in the massage room
- Removal and reinstallation of the jacuzi with the installation of the new decorative panels on the sides and the installation of the new step for the access to the pool
- Replacing of the shower and realization of a new shower area with a new design composed by new panels, towel rack, shower tray with new accessories
- Dismounting and realization of the new partition with a new layout that included the setting of a stainless steel structure, covered with panels coated by plastic laminate and installation of the decorative frames and shelve
- Installation of new lights in the jacuzi area
Work report
Activity completed as scheduled on scope of work
SPA VILLA’S
DK9 FR. 283-301
Carnival Ecstasy
October 2019 Freeport Bahamas
Scope of work
- Replacement of the vinyl floor inside Entrance, waiting rooms and aisle including underlay restoration and new skirting following IMO and USPHS rules
- Renew of cabinet doors and reception desk
- Replacement of wall paper in the waiting rooms
Work report
Activity completed in advance as scheduled on scope of work
MEDICAL CENTER
DK3 FR. 228-244




Carnival Imagination
October 2019 Portland OR USA
Scope of work
- Replacement of the vinyl floor inside Entrance, waiting rooms and aisle including underlay restoration and new skirting following IMO and USPHS rules
- Renew of cabinet doors and reception desk
- Replacement of wall paper in the waiting rooms
Work report
Activity completed in advance as scheduled on scope of work
MEDICAL CENTER
DK3 FR. 228-244




Carnival Sensation
January 2020 Freeport Bahamas
Scope of work
- Replacement of the vinyl floor inside the medical center (excluding bathrooms and lumber-room) including underlay restoration and new skirting following IMO and USPHS rules
- Renew of cabinet doors and reception desk
- Replacement of wall paper in the waiting rooms
Work report
Activity completed in advance as scheduled on scope of work
MEDICAL CENTER
DK3 FR. 228-244




Seabourn Ovation
June 2021 Greece
Scope of work
- Floor sanding
- Application of the anti-stain on the entire surface
Work report
Activity completed as scheduled on scope of work
MAIN RESTAURANT
DK4